The list includes only the contributions during regular LS3 Committee meetings. It does not include special (RR, Countdown, Mission,…) and satellite events.

DomainTitleSpeakersSlidesMinutesIndicoDate
LS3 CommitteeFeedback Chamonix (25′ + 10′)Jean-Philippe TockSlidesEDMSLS3C #282026-02-25
Radioprotection / LogisticsITM tool – update and demonstration of practical cases (15′ + 10′)Philippe BertreixSlidesEDMSLS3C #282026-02-25
RadioprotectionLaunch of the 2026 Radioactive waste forecast exercise (5′ + 5′)Frederic Lionel AberleSlidesEDMSLS3C #282026-02-25
SafetyWSS role and responsibilitiesOlivier Bernard ProuteauSlidesEDMSLS3C #272026-01-28
RadioprotectionUpdate of ALARA Level 3 intervention list (10′ + 5′)Ans PardonsSlidesEDMSLS3C #272026-01-28
Radioprotection / LogisticsStatus of the ITM tool for the internal transport of radioactive material (15′ +5′)Ricardo AlmeidaSlidesEDMSLS3C #272026-01-28
Radioprotection / LogisticsOptimization of the storage of radioactive componentsSlides #1EDMSLS3C #272026-01-28
Slides #2
LogisticsOutcome of the LS3 space management and logistics reviewGermana Riddone, Rende SteerenbergSlidesEDMSLS3C #262026-01-14
Coordination and SchedulePLANFernando Baltasar Dos Santos PedrosaSlidesEDMSLS3C #262026-01-14
EL servicesMandate of the technical coordinator of the SPS2 activitiesBruno BalhanSlidesEDMSLS3C #262026-01-14
Engineering&IntegrationIntegration Studies for the SPS BAs (5′)Julie CoupardEDMSEDMSLS3C #252025-11-26
SafetyElectrical Safety Project – (20′ + 10′)Anne-Laure PerrotSlidesEDMSLS3C #252025-11-26
ISOLDE imprThe IBDRS project status (15′ + 5′)Ana-Paula BernardesSlidesEDMSLS3C #252025-11-26
Engineering&IntegrationISOLDE ECRs update (5′ + 5′)Joachim VollaireSlidesEDMSLS3C #252025-11-26
Engineering&IntegrationNaming Conventions of Electrical Circuits and Power Converters for the SPS and Transfer Lines (10′ + 5′)Jean-Baptiste MayoliniSlidesEDMSLS3C #252025-11-26
Engineering&IntegrationUpdate on Naming Changes in East and North AreaGiulia RomagnoliSlidesEDMSLS3C #252025-11-26
LS3 CommitteeReview of actions/recommendations (10′ + 5′)Charlotte Duchemin, Sebastien BlanchardSlidesEDMSLS3C #252025-11-26
SafetyUpdate on safety related documents (10′ + 5′)Julien Mickael FernandezSlidesEDMSLS3C #242025-10-29
SafetyNew self-rescue mask (10′ + 5′)Anastasiia KhrapchunSlidesEDMSLS3C #242025-10-29
Engineering&IntegrationStatus of ECR, Integration studies and WPA in view of YETS 2025-26 & LS3 (20′ + 10′)Giulia Romagnoli, Julie Coupard, Sonia Bartolome JimenezSlides #1EDMSLS3C #242025-10-29
Slides #2
HI-ECN3HIECN3 storage request (5′ + 5′)Francois ButinSlidesEDMSLS3C #242025-10-29
LS3 CommitteeLS3 presentation to CERN’s Contractors (5′ + 5′)Jean-Philippe TockSlidesEDMSLS3C #242025-10-29
Coordination and ScheduleCountdown to LS3: Injectors-related outcome (30’+10′)Fernando Baltasar Dos Santos PedrosaSlidesEDMSLS3C #232025-10-01
Coordination and ScheduleLS3 injectors schedule optimisation (15’+5′)Jean-Philippe TockEDMSEDMSLS3C #232025-10-01
SafetyLHC underground occupancy review for LS3 (15’+5’)Edda Iveland, Lorenzo Contini, Oriol RiosEDMSEDMSLS3C #222025-08-20
Civil EngineeringCivil engineering metallic structures to be installed during LS3 (10’+5’)Severin D’ArmancourtSlidesEDMSLS3C #222025-08-20
ConsolidationAD/ELENA LS3 activities (15’+5′)Francois ButinSlidesEDMSLS3C #222025-08-20
NA-CONSNA-CONS: PLAN & Logistics Updates (10′ + 5′)Deepti KandholSlidesEDMSLS3C #222025-08-20
Coordination and SchedulePLAN activities – status (15’+5′)Fernando Baltasar Dos Santos Pedrosa, Marta Vargas JorbaSlidesEDMSLS3C #222025-08-20
LS3 CommitteeStatus of actions/recommendations (15′ + 5′)Sebastien BlanchardSlidesEDMSLS3C #212025-07-09
HI-ECN3HIECN3 project update (15’+5’)Matthew Alexander FraserSlidesEDMSLS3C #212025-07-09
NA-CONSNA62 dismantling update (10’+5’)Hans DanielssonSlidesEDMSLS3C #212025-07-09
Engineering&IntegrationUpdate on Accelerators’ ECR for YETS 2025-26 and LS3 (10′ +5′)Jean-Baptiste MayoliniSlidesEDMSLS3C #212025-07-09
Engineering&IntegrationUpdate on Accelerators’ Integration Studies for YETS 2025-26 and LS3 (10′ + 5′)Julie CoupardSlidesEDMSLS3C #212025-07-09
Engineering&IntegrationUpdate on Experimental Areas’ ECR and Integration Studies for YETS 2025-26 and LS3 (10′ + 5′)Natalya KahnSlidesEDMSLS3C #212025-07-09
ISOLDE imprISOLDE Improvement Program implementation during LS3 (20’+5’)Ana-Paula Bernardes, Erwin SieslingSlides #1EDMSLS3C #202025-06-25
Slides #2
PSSUpdate PSS project (15’+5’)Sebastien EvrardSlidesEDMSLS3C #202025-06-25
ServicesNew scaffolding contract (10’+5′)Frederic ChapronSlidesEDMSLS3C #202025-06-25
ServicesEN-ACE-COS workshop support during LS3 (10’+5′)Jordi BossySlidesEDMSLS3C #202025-06-25
Coordination and ScheduleNew PLAN activitiesJeremie Bauche, Raymond VenessSlides #1EDMSLS3C #192025-06-11
Slides #2
HL-LHCHL-LHC Cores – Schedule Update (15’+5′)David Rodriguez GomezSlidesEDMSLS3C #192025-06-11
AWAKEStart of LS3 for AWAKE and CTD (10’+5′)Ans PardonsEDMSEDMSLS3C #192025-06-11
NA-CONSUpdate NA-CONS project (20’+5′)Yacine KadiSlidesEDMSLS3C #192025-06-11
Coordination and ScheduleLS3 LHC schedule update (25’+ 5′)Estrella Vergara FernandezEDMSEDMSLS3C #192025-06-11
Coordination and SchedulePLAN ContributionsMarta Vargas JorbaSlidesEDMSLS3C #182025-05-28
Coordination and ScheduleAnnouncement: New PLAN ActivitiesJean Ramos, Julien Parra-Lopez, Valerie Montabonnet, Xavier GenillonSlidesEDMSLS3C #182025-05-28
EL servicesLS3 power availability update and LHC schedule optimisation possibilities for EN-EL activities (25’+5′)Jan De VoghtSlidesEDMSLS3C #182025-05-28
LogisticsADR – transport of dangerous goods (10’+10′)Iqra Shahzadi, Jonathan GulleySlidesEDMSLS3C #182025-05-28
LogisticsUpdate space management status – Including LHC Point 1 and 5 (10’+5′)Cedric Halbert, Germana RiddoneSlides #1EDMSLS3C #182025-05-28
Slides #2
Slides #3
SafetyWelcomeJean-Philippe TockEDMSEDMSLS3C #172025-05-14
SafetyIntroductionAndreas HertySlidesEDMSLS3C #172025-05-14
SafetyRoles and responsibilities (15’+10′)Julien Mickael FernandezSlidesEDMSLS3C #172025-05-14
SafetyOperational Safety (25’+10′)Cyrille Patrick Bedel, John Robert EtheridgeSlidesEDMSLS3C #172025-05-14
SafetySafety Training (10’+5′)Julie BiringerSlides #1EDMSLS3C #172025-05-14
Slides #2
SafetyEnvironment and Waste Management in View of LS3 (10’+5′)Amel Ashila, Sabrina SchadeggEDMSLS3C #172025-05-14
SafetyRadiation Protection (10’+5′)Stefan RoeslerSlidesEDMSLS3C #172025-05-14
SafetyALARA Level 3 intervention list (draft) (5’+5′)Ans PardonsEDMSEDMSLS3C #172025-05-14
SafetySafety inspection and receptions during LS3 (10’+5′)David Tshilumba, Olivier TisonSlidesEDMSLS3C #172025-05-14
SafetyConclusions & DiscussionEDMSLS3C #172025-05-14
LogisticsAnnouncement: Update Storage space requests and “Bases de Chantier”Germana RiddoneSlidesEDMSLS3C #162025-04-30
Running FacilitiesFacilities running during LS3 (25’+5′)Bettina MikulecSlidesEDMSLS3C #162025-04-30
Coordination and SchedulePLAN status: Resource allocation (20’+5′)Marta Vargas JorbaSlidesEDMSLS3C #162025-04-30
SafetyLS3C safety meetingAndreas HertySlidesEDMSLS3C #152025-04-02
Coordination and ScheduleYETS 2025-26 roadmap for InjectorsMarzia BernardiniSlidesEDMSLS3C #152025-04-02
Engineering&IntegrationUpdate on ECR and Integration Studies for YETS 2025-26 and LS3 (30′ + 10′)Giulia Romagnoli, Julie Coupard, Tom BirtwistleSlides #1EDMSLS3C #152025-04-02
Slides #2
Slides #3
Coordination and ScheduleFeedbacks from the Chamonix Workshop on the LS3 session (25’+5′)Jean-Philippe TockSlidesEDMSLS3C #142025-02-19
Radioprotection Update on the Dismantling and Decontamination contract (NDDC) following shift of LS3 start date (15’+5′)Nicolas QuinquisSlidesEDMSLS3C #142025-02-19
LS3 CommitteeReminder of actions/recommendations (10′ + 5′)Charlotte Duchemin, Sebastien BlanchardSlidesEDMSLS3C #132024-11-27
HL-LHCPreliminary outcome for the HL-LHC Cost & Schedule Review 2024 (20′ + 5′)Markus ZerlauthSlidesEDMSLS3C #132024-11-27
Coordination and ScheduleCERN long term schedule update (10′ + 5′)Rende SteerenbergSlidesEDMSLS3C #132024-11-27
NA-CONSTDC2/TCC2 renovation: Feedback from the ATS-MB mini review (20′ + 5′)Yacine KadiSlidesEDMSLS3C #132024-11-27
Coordination and Schedule(E)YETS 2024-25 and YETS 2025-26 Master Schedules (10′ +10′)Marzia BernardiniSlidesLS3C #122024-10-30
Coordination and SchedulePLAN update YETS 2024-25 (15′ + 10′)Ayla BorglundSlidesLS3C #122024-10-30
Engineering&IntegrationUpdate on ECR and Integration Studies for YETS 2024-25 (30′ + 10′)Giulia Romagnoli, Julie Coupard, Thomas William BirtwistleSlides #1LS3C #122024-10-30
Slides #2
Slides #3
Coordination and ScheduleYETS 2025-26 (15′ + 10′)Jean-Philippe TockEDMSLS3C #112024-10-16
EN Dep GroupsEN-AA (5′ + 5′)Pierre NininSlidesLS3C #112024-10-16
LHC Large ExperimentsCMS (5′ + 5′)Paola TropeaSlidesLS3C #112024-10-16
SY Dep GroupsSY-BI (5′ + 5′)Raymond VenessSlidesLS3C #112024-10-16
SY Dep GroupsSY-RF (5′ +5′)Frank GerigkSlidesLS3C #112024-10-16
LS3 CommitteeFeedback from the LS3 Readiness Review (20′ + 5′)Jean-Philippe TockEDMSLS3C #112024-10-16
HL-LHCFeedback from the IT String day (20′ + 5′)Marta BajkoSlidesLS3C #112024-10-16
EL servicesEL-CONS project (20′ + 5′)Mario ParodiSlidesLS3C #102024-08-21
EL servicesDecabling project (20′ + 5′)Christian BernardSlidesLS3C #102024-08-21
Running FacilitiesStatus of the change requests for the facilities (primary beam lines) for YETS 2024-2025 and LS3 (20′ + 5′)Thomas William BirtwistleSlidesLS3C #102024-08-21
Engineering&IntegrationStatus of the ECRs and the integration studies for the experimental areas for LS3 (20′ + 5′)Giulia Romagnoli, Michael LazzaroniSlidesLS3C #102024-08-21
LS3 CommitteeLS3 Readiness Review AgendaCharlotte Duchemin, Jean-Philippe Tock, Rende Steerenberg, Sandra Benoit-Godet, Sebastien BlanchardEDMSLS3C #102024-08-21
EL servicesEN-EL contributions during LS3 – an update (15′ + 5′)Simao Pedro Costa MachadoSlidesLS3C #92024-08-07
Engineering&IntegrationIntegration Studies of the accelerators for LS3 activities (20′ + 5′)Jean-Pierre CorsoSlidesLS3C #92024-08-07
Engineering&IntegrationStatus of ECRs for the experimental areas – YETS 2024-25 (10′ + 5′)Giulia RomagnoliSlidesLS3C #92024-08-07
SurveySurvey Guidelines (20′ + 5′)Jean-Frederic FuchsSlidesLS3C #92024-08-07
LS3 CommitteeList of open actions/recommendationsCharlotte DucheminSlidesLS3C #82024-07-24
AWAKEAWAKE RUN2C&D PREP. (20′ + 5′)Edda GschwendtnerSlidesLS3C #82024-07-24
Coordination and ScheduleTE resources allocation for LS3 (10′ + 5′)Beniamino Di GirolamoSlidesLS3C #82024-07-24
NA-CONSPlans for the NA62 dismantling (10′ + 5′)Francois DuvalSlidesLS3C #82024-07-24
LHC Exp (tunnel)Mandate of the coordinator for the (smaller) physics experiments in the LHC machine (10’+5′)Oliver BoettcherSlidesLS3C #82024-07-24
Radioprotection Personal and operational dosimeter needs during LS3 (10′ + 5′)¶Heinz VinckeSlidesLS3C #82024-07-24
Coordination and SchedulePLAN status (10′ + 5′)Fernando Baltasar Dos Santos PedrosaSlidesLS3C #82024-07-24
Controls and SoftwareProposal for coordination of accelerator controls upgrades in LS3 (15’+5′)Marine Gourber-PaceSlidesLS3C #72024-07-03
Radioprotection ALARA Level 3 committee related to LS3 activities – status of received requestsAns PardonsEDMSLS3C #72024-07-03
Coordination and ScheduleImpact of possible LS3 delays on procurement contracts (5′ + 5′)Charles Carayon, Josh DavisonSlidesLS3C #72024-07-03
LogisticsLS3 storage management: reminder and current statusGermana RiddoneSlidesLS3C #72024-07-03
Civil EngineeringAnnouncement of SCE projects during LS3 (5’+5′)Denis PazemSlidesLS3C #72024-07-03
ISOLDE imprISOLDE Beam Dump Replacement & Sustainability (IBDRS) Project Readiness & Impact during LS3 (20′ + 5′)Ana-Paula Bernardes, Joachim VollaireEDMS #1LS3C #72024-07-03
EDMS #2
NA-CONSNA-CONS Review Summary and Results (15′ + 5′)Yacine KadiSlidesLS3C #72024-07-03
LS3 CommitteeLMC : LHC status, and follow up of operational issuesEDMSLS3C #62024-06-26
Coordination and ScheduleLS3 Readiness Review Agenda & OutlooksJean-Philippe TockEDMSLS3C #62024-06-26
LHC Large ExperimentsCMS plans for LS3 and its preparation (20′ + 5′)Paola TropeaSlidesLS3C #62024-06-26
LHC Large ExperimentsATLAS Activities During LS3 (20′ + 5′)Martin AleksaSlidesLS3C #62024-06-26
SafetyEvacuation exercises – Planned Evacuations (15′ + 5′)Sara HansenSlidesLS3C #52024-06-12
Running FacilitiesSM18 Operation during LS3 (20′ + 5′)Luigi ScibileSlidesLS3C #52024-06-12
SRFSA18 – New SRF Facility on LHC Point 1.8 (20′ + 5′)David SmekensSlidesLS3C #52024-06-12
SafetyESP status and plan for (E)YETS 2024-25 (20’ + 5’)Anne-Laure PerrotSlidesLS3C #42024-05-29
LogisticsTransport and Handling in LS3 : highlights – EN-HE (15′ + 5′)Caterina BertoneSlidesLS3C #42024-05-29
PSS-CONSPSS-CONS Personnel Safety System Consolidation: Overview of LS3 activities (15’+5′)Anna SuwalskaSlidesLS3C #42024-05-29
TG-CONSTG-CONS Technical Gallery Consolidation Program: Overview of LS3 activities (10′ + 5′)Sebastien EvrardSlidesLS3C #42024-05-29
Coordination and ScheduleLong term schedule update (15′ + 5′)Jean-Philippe TockSlidesLS3C #32024-05-15
Engineering&IntegrationConfiguration and Layout (20′ + 5′)Sonia Bartolome JimenezSlidesLS3C #32024-05-15
Radioprotection Intervention planning at CERN – ALARA rules (15’+5’)Claudia AhdidaSlidesLS3C #32024-05-15
Radioprotection Preparing LS3’s ALARA committees (15′ + 5′)Ans PardonsEDMSLS3C #32024-05-15
CNGS dismantlingThe CNGS Target Area Dismantling Project (20′ + 5′)Ans PardonsEDMSLS3C #32024-05-15
Engineering&IntegrationIntegration Studies of the accelerators for LS3 activities (20′ + 5′ questions)Julie CoupardSlidesLS3C #22024-04-17
Radioprotection / LogisticsLe transport interne de marchandises radioactives au CERN et le rôle du groupe de Radioprotection (20′ + 5′ questions)Philippe BertreixSlidesLS3C #22024-04-17
HL-LHCHL-LHC: overview of LS3 activities (20′ + 5′ questions)Paolo FessiaSlidesLS3C #22024-04-17
BSTBeam-Screens Treatment project: overview of the activities during LS3 (20′ + 5′ questions)Guillaume RosazSlidesLS3C #22024-04-17
NA-CONSThe North Area Consolidation Project (20′ + 5′ questions)Thomas ZicklerSlidesLS3C #22024-04-17
HI-ECN3HI-ECN3 project: foreseen activities in LS3 (20′ + 5′ questions)Matthew FraserSlides #1LS3C #22024-04-17
Slides #2
LS3 CommitteeIntroductionJean-Philippe TockEDMSLS3C #12024-03-20
LS3 CommitteeLS3C modalitiesCharlotte Duchemin, Sebastien BlanchardSlidesLS3C #12024-03-20
Coordination and ScheduleYETS 2024-2025 updateRende SteerenbergLS3C #12024-03-20
Coordination and SchedulePLANAyla BorglundLS3C #12024-03-20
Radioprotection / LogisticsRadioactive material and waste (storage, declaration)Stefan RoeslerSlidesLS3C #12024-03-20
LogisticsLS3 Space Management and LogisticsGermana RiddoneEDMSLS3C #12024-03-20
LS3 CommitteeLS3 Readiness ReviewJean-Philippe TockSlidesLS3C #12024-03-20