Topics and Presentations

The list includes only the contributions during regular LS3 Committee meetings. It does not include special (RR, Countdown, Mission,…) and satellite events.

DomainTitleSpeakersSlidesMinutesIndicoDate
ProjectIntroduction to FASER and SND (5′ + 5′)Francisco Sanchez GalanSlidesEDMSLS3C #422026-10-23
ProjectAnnouncement: AICE (5′ +5′)Sergio CalatroniSlidesEDMSLS3C #422026-10-23
Coordination and scheduleDashboard Update (5′ + 5′)SlidesEDMSLS3C #422026-10-23
Coordination and schedulePLAN general update (15′ + 5′)Paula Lorente Gomez, Silvia GrauSlidesEDMSLS3C #422026-10-23
Coordination and scheduleUpdate LHC Schedule (10′ + 5′)Maria Barberan MarinSlidesEDMSLS3C #422026-10-23
RadioprotectionUpdate on the Task Force on the storage of radioactive components (15′ + 5′)Germana RiddoneSlidesEDMSLS3C #422026-10-23
SafetyRecent electrical incidents (LHC LSS1 & NA BA80) (10’+5′)Julien Mickael Fernandez, Paolo FessiaSlidesEDMSLS3C #412026-10-09
Coordination and scheduleDashboard Update (5’+5′)Beniamino Di GirolamoSlidesEDMSLS3C #412026-10-09
Coordination and scheduleInjectors Status update & report on PS ISTsArne VangraefschepeSlidesEDMSLS3C #412026-10-09
Coordination and scheduleUpdate on the HI-ECN3 dismantling activities (15’+5′)Fernando Baltasar Dos Santos PedrosaSlidesEDMSLS3C #412026-10-09
Coordination and scheduleREX & lesson learned  from the dismantling activities CNGS & IBDRS (15’+5′)Nicolas QuinquisSlidesEDMSLS3C #412026-10-09
Coordination and scheduleDecision on TE resources for CM1 refurbishment (5′ + 5′)Beniamino Di GirolamoSlidesEDMSLS3C #402026-09-25
Coordination and scheduleDashboard update (10′ + 5′)SlidesEDMSLS3C #402026-09-25
Coordination and scheduleELQA at Warm: Results and potential impact on LS3 activities (15’+5′)Giorgio D’AngeloSlidesEDMSLS3C #402026-09-25
HL-LHCHL-LHC reportPaolo FessiaSlidesEDMSLS3C #402026-09-25
Engineering&IntegrationUpdate on ECR integration studiesGiulia Romagnoli, Julie Coupard, Natalya Kahn, Tom BirtwistleSlides #1EDMSLS3C #402026-09-25
Slides #2
Slides #3
Coordination and scheduleReport on ISTs for Linac4, PSB, SPS and injectors statusMarkus AlbertSlidesEDMSLS3C #402026-09-25
Coordination and scheduleNA-CONS – BA80 and CT2 during LS3: Category 1 Worksite Perimeters and Schedule Impact (10′ + 5′)Anastazja SedzickaSlidesEDMSLS3C #392026-09-09
Coordination and scheduleIMPACT prioritisation process (5’ + 5’)Giovanni ChiericoSlidesEDMSLS3C #392026-09-09
Coordination and scheduleTCLD strategy : impact on LS3 schedule and resources (5’ + 5´)Antonio Perillo MarconeLS3C #392026-09-09
Coordination and scheduleAvailability and Status of Accelerators’ and Experiments’ Lifts (15′ + 5′)Ingo RuehlSlidesEDMSLS3C #392026-09-09
Coordination and scheduleDashboard update (10’+5′)All, Beniamino Di GirolamoSlides #1LS3C #392026-09-09
Slides #2
Coordination and scheduleRP Dashboard (15’+5′)Angelo InfantinoSlidesEDMSLS3C #392026-09-09
SafetyUpdates to the Radiation Protection training programme (10′ + 5′)Julie BiringerSlidesEDMSLS3C #392026-09-09
SafetySafety reminder:  Fire detectorsJulien Mickael FernandezSlidesEDMSLS3C #382026-08-26
Coordination and scheduleAnnouncement:   EACM Kick-offBenoit SalvantSlidesEDMSLS3C #382026-08-26
Coordination and scheduleCTF3 DBL Dismantling Activity (5’+5′)Rosario PrincipeSlidesEDMSLS3C #382026-08-26
Coordination and scheduleLHC Schedule status (15’+5′)Giulia Papotti, Maria Barberan Marin, Michele LoffredoSlidesEDMSLS3C #382026-08-26
Controls and SoftwareLS3 workflow management tool (15’+5′)Lukasz Piotr Pater, Maryline Charrondiere, Matthias Bonora-TamSlidesEDMSLS3C #382026-08-26
Coordination and scheduleBST Readiness (10’+5′)Guillaume Jonathan RosazSlidesEDMSLS3C #382026-08-26
Coordination and scheduleAET Update (5’+5′)Laura HardySlidesEDMSLS3C #382026-08-26
HL-LHCHL-LHC update (10’+5′)Paolo FessiaSlidesEDMSLS3C #362026-07-29
Coordination and ScheduleElectrical quality assurance @ Cold: Results and potential impact on LS3 activities (10’+5′)Giorgio D’Angelo, Mateusz Jakub BednarekSlidesEDMSLS3C #362026-07-29
SafetyLessons learnt from ESP deployment in the LHC (15′)Anne-Laure PerrotSlidesEDMSLS3C #362026-07-29
SafetyProcesses & Safety forms for el. installations without C2E appointed yet (15’+5′)Maria PapamichaliSlides #1EDMSLS3C #362026-07-29
Slides #2
Slides #3
SafetyAnnouncement: Prevention measures in relation to high fire risk across the CERN siteSimon MarshSlidesLS3C #352026-07-15
SafetyAnnouncement: Update on radiation dose alert and approval process (5’+5′)Stefan RoeslerSlidesLS3C #352026-07-15
Coordination and ScheduleAET update (5’+5′)Laura HardySlidesLS3C #352026-07-15
Coordination and ScheduleLS3 Dashboards (15′ + 5′)Beniamino Di GirolamoSlidesLS3C #352026-07-15
Coordination and ScheduleLHC Cryogenics warm-up (15′ +5′)Benjamin Bradu, Frederic FerrandSlidesLS3C #352026-07-15
Coordination and ScheduleLS3 LHC Status (10′ + 5′)Maria Barberan MarinSlidesLS3C #352026-07-15
Coordination and ScheduleLS3 Start at ATLAS (8′ + 2′)Gerardo Velazquez Gutierrez, Martin AleksaSlidesLS3C #352026-07-15
Coordination and ScheduleLS3 Start at CMS (8′ + 2′)David Hay, Paola TropeaSlidesLS3C #352026-07-15
Coordination and ScheduleISOLDE LS3 activities: progress report (15′ + 5′)Joachim VollaireSlidesLS3C #352026-07-15
Running FacilitiesOutcome from the running facility document (5 + 5′)Richard ScrivensSlidesLS3C #352026-07-15
Coordination and ScheduleMTP2026 outcome impact on LS3 (15’ + 10’)Oliver BruningSlidesEDMSLS3C #342026-07-01
Coordination and ScheduleOutcome from the Mission: LS3 checkup event (15′ + 5′)Jean-Philippe TockSlidesEDMSLS3C #342026-07-01
Coordination and ScheduleRF test and recent M2B1 event (10′ + 5′)Katarzyna Turaj, Giulia PapottiSlides #1EDMSLS3C #342026-07-01
Slides #2
Coordination and ScheduleBE-CSS LS3 baseline deployment and impact (15′ + 5′)Anastasiya Radeva PoncetSlidesEDMSLS3C #342026-07-01
Obsolete Connectors – Status from standardisation committee for cables and connectors (12′ + 3′)Simao Pedro Costa MachadoLS3C #342026-07-01
Coordination and SchedulePLAN activities – announcement (10′ + 10′)Inigo Martin Melero, Sebastien EvrardSlides #1EDMSLS3C #342026-07-01
Slides #2
Coordination and ScheduleUpdate on AET Process (5′ + 5′)Laura HardySlidesEDMSLS3C #342026-07-01
Coordination and ScheduleLS3 Dashboards (20′ + 5′)Beniamino Di GirolamoSlides #1LS3C #342026-07-01
Slides #2
Coordination and ScheduleThe proposed Aladdin experiment at LHC IP3 and possible LS3 activities  (15′ +5′)Francesco BertinelliSlidesEDMSLS3C #332026-06-03
Controls and softwareITM Tool update – Result of the deployment and available training  (15′ +5′)Ricardo AlmeidaSlidesEDMSLS3C #332026-06-03
Coordination and ScheduleReview of the LS3 committee resolutions  (15′ +5′)Charlotte Duchemin, Sebastien BlanchardSlidesEDMSLS3C #332026-06-03
Coordination and ScheduleNew AET Procedure – Autorisation Exceptionnelle de Travail – ( 15′ + 5′)Charles Carayon, Didier Constant, Eloy Reguero FuentesEDMSLS3C #322026-05-20
ProjectISOLDE Primary Areas Fire Safety and Ventilation Upgrade Project Reaches CompletionMelania AvernaSlidesEDMSLS3C #322026-05-20
RadioprotectionUpdate regarding the status of the ALARA3 committees (15′ + 10′)Ans PardonsSlidesEDMSLS3C #322026-05-20
ServicesStatus of AICE – Atom Interferometry CERN Experiment (15 ‘+ 5’)Sergio CalatroniSlidesEDMSLS3C #322026-05-20
Coordination and ScheduleMission: LS3 Checkup – agendaRichard ScrivensSlidesEDMSLS3C #312026-05-06
Coordination and ScheduleDashboards IBDRS & CTDBeniamino Di Girolamo, Charlotte Duchemin, Tobias BachmannSlidesEDMSLS3C #312026-05-06
RadioprotectionNorth Area Radioactive Waste Task ForceThomas ZicklerSlidesEDMSLS3C #312026-05-06
Engineering&IntegrationStatus of ECR, Integration studies for Accelerator (15′ +5′)Julie Coupard, Sonia Bartolome JimenezSlidesEDMSLS3C #312026-05-06
Engineering&IntegrationStatus of ECR, Integration studies and WPA for EA (15′ +5′)Natalya KahnSlidesEDMSLS3C #312026-05-06
Coordination and ScheduleUpdated LS3 LHC Schedule (20′ + 10′)Michele LoffredoSlidesEDMSLS3C #312026-05-06
SafetySafety announcement (5′)Julien Mickael FernandezSlidesEDMSLS3C #302026-04-22
Coordination and ScheduleHIE-ISOLDE cryomodule activities during LS3 (15′ + 5′)Walter Venturini DelsolaroSlidesEDMSLS3C #302026-04-22
Coordination and ScheduleTE contribution to HIE-ISOLDE – WP6a – Resource & Schedule Outlook (10′ + 5′)Amalia BallarinoSlidesEDMSLS3C #302026-04-22
SafetyESP implementation in the LHC and its injectors (20′ + 10′)Anne-Laure Perrot, Denis RibiolletSlidesEDMSLS3C #302026-04-22
Coordination and ScheduleCNGS Hadron stopper shielding recovery: Feasibility study update (15′ + 10′)Caterina Bertone, Jean-Louis GrenardSlidesEDMSLS3C #302026-04-22
Coordination and ScheduleSCE Civil Engineering Activities (PLAN) – 5′ +5′Severin D’ArmancourtSlidesEDMSLS3C #302026-04-22
Coordination and ScheduleDashboard SY-EPC, Linac4, PSB, PS&TT2, SPS (5′)Beniamino Di GirolamoSlidesEDMSLS3C #302026-04-22
Coordination and ScheduleRequest for beam from ELENA (GBAR) – 10′ + 5′Pauline CominiSlidesEDMSLS3C #292026-03-25
Coordination and ScheduleRobotics service: Capabilities, Planned Missions and Early Engagement (15′ + 10′)Hannes GamperSlidesEDMSLS3C #292026-03-25
Controls and softwareStatus of the integration of the e-MIP tool in the EAM environment (15 + 10′)Lukasz Piotr Pater, Matthias BonoraSlidesEDMSLS3C #292026-03-25
Coordination and ScheduleSPS2 cabling activities (10′ + 5′)Christian BernardSlidesEDMSLS3C #292026-03-25
Coordination and ScheduleDashboard ISOLDE & CNGS & WP17 HL-LHC (5′)Beniamino Di GirolamoSlidesEDMSLS3C #292026-03-25
Coordination and ScheduleMaster Schedule under Approval (5′)David NisbetSlidesEDMSLS3C #292026-03-25
LS3 CommitteeFeedback Chamonix (25′ + 10′)Jean-Philippe TockSlidesEDMSLS3C #282026-02-25
Radioprotection / LogisticsITM tool – update and demonstration of practical cases (15′ + 10′)Philippe BertreixSlidesEDMSLS3C #282026-02-25
RadioprotectionLaunch of the 2026 Radioactive waste forecast exercise (5′ + 5′)Frederic Lionel AberleSlidesEDMSLS3C #282026-02-25
SafetyWSS role and responsibilitiesOlivier Bernard ProuteauSlidesEDMSLS3C #272026-01-28
RadioprotectionUpdate of ALARA Level 3 intervention list (10′ + 5′)Ans PardonsSlidesEDMSLS3C #272026-01-28
Radioprotection / LogisticsStatus of the ITM tool for the internal transport of radioactive material (15′ +5′)Ricardo AlmeidaSlidesEDMSLS3C #272026-01-28
Radioprotection / LogisticsOptimization of the storage of radioactive componentsSlides #1EDMSLS3C #272026-01-28
Slides #2
LogisticsOutcome of the LS3 space management and logistics reviewGermana Riddone, Rende SteerenbergSlidesEDMSLS3C #262026-01-14
Coordination and SchedulePLANFernando Baltasar Dos Santos PedrosaSlidesEDMSLS3C #262026-01-14
EL servicesMandate of the technical coordinator of the SPS2 activitiesBruno BalhanSlidesEDMSLS3C #262026-01-14
Engineering&IntegrationIntegration Studies for the SPS BAs (5′)Julie CoupardEDMSEDMSLS3C #252025-11-26
SafetyElectrical Safety Project – (20′ + 10′)Anne-Laure PerrotSlidesEDMSLS3C #252025-11-26
ISOLDE imprThe IBDRS project status (15′ + 5′)Ana-Paula BernardesSlidesEDMSLS3C #252025-11-26
Engineering&IntegrationISOLDE ECRs update (5′ + 5′)Joachim VollaireSlidesEDMSLS3C #252025-11-26
Engineering&IntegrationNaming Conventions of Electrical Circuits and Power Converters for the SPS and Transfer Lines (10′ + 5′)Jean-Baptiste MayoliniSlidesEDMSLS3C #252025-11-26
Engineering&IntegrationUpdate on Naming Changes in East and North AreaGiulia RomagnoliSlidesEDMSLS3C #252025-11-26
LS3 CommitteeReview of actions/recommendations (10′ + 5′)Charlotte Duchemin, Sebastien BlanchardSlidesEDMSLS3C #252025-11-26
SafetyUpdate on safety related documents (10′ + 5′)Julien Mickael FernandezSlidesEDMSLS3C #242025-10-29
SafetyNew self-rescue mask (10′ + 5′)Anastasiia KhrapchunSlidesEDMSLS3C #242025-10-29
Engineering&IntegrationStatus of ECR, Integration studies and WPA in view of YETS 2025-26 & LS3 (20′ + 10′)Giulia Romagnoli, Julie Coupard, Sonia Bartolome JimenezSlides #1EDMSLS3C #242025-10-29
Slides #2
HI-ECN3HIECN3 storage request (5′ + 5′)Francois ButinSlidesEDMSLS3C #242025-10-29
LS3 CommitteeLS3 presentation to CERN’s Contractors (5′ + 5′)Jean-Philippe TockSlidesEDMSLS3C #242025-10-29
Coordination and ScheduleCountdown to LS3: Injectors-related outcome (30’+10′)Fernando Baltasar Dos Santos PedrosaSlidesEDMSLS3C #232025-10-01
Coordination and ScheduleLS3 injectors schedule optimisation (15’+5′)Jean-Philippe TockEDMSEDMSLS3C #232025-10-01
SafetyLHC underground occupancy review for LS3  (15’+5’)Edda Iveland, Lorenzo Contini, Oriol RiosEDMSEDMSLS3C #222025-08-20
Civil EngineeringCivil engineering metallic structures to be installed during LS3  (10’+5’)Severin D’ArmancourtSlidesEDMSLS3C #222025-08-20
ConsolidationAD/ELENA LS3 activities (15’+5′)Francois ButinSlidesEDMSLS3C #222025-08-20
NA-CONSNA-CONS:  PLAN & Logistics Updates (10′ + 5′)Deepti KandholSlidesEDMSLS3C #222025-08-20
Coordination and SchedulePLAN activities – status (15’+5′)Fernando Baltasar Dos Santos Pedrosa, Marta Vargas JorbaSlidesEDMSLS3C #222025-08-20
LS3 CommitteeStatus of actions/recommendations (15′ + 5′)Sebastien BlanchardSlidesEDMSLS3C #212025-07-09
HI-ECN3HIECN3 project update (15’+5’)Matthew Alexander FraserSlidesEDMSLS3C #212025-07-09
NA-CONSNA62 dismantling update (10’+5’)Hans DanielssonSlidesEDMSLS3C #212025-07-09
Engineering&IntegrationUpdate on Accelerators’ ECR for YETS 2025-26 and LS3 (10′ +5′)Jean-Baptiste MayoliniSlidesEDMSLS3C #212025-07-09
Engineering&IntegrationUpdate on Accelerators’ Integration Studies for YETS 2025-26 and LS3 (10′ + 5′)Julie CoupardSlidesEDMSLS3C #212025-07-09
Engineering&IntegrationUpdate on Experimental Areas’ ECR and Integration Studies for YETS 2025-26 and LS3 (10′ + 5′)Natalya KahnSlidesEDMSLS3C #212025-07-09
ISOLDE imprISOLDE Improvement Program implementation during LS3 (20’+5’)Ana-Paula Bernardes, Erwin SieslingSlides #1EDMSLS3C #202025-06-25
Slides #2
PSSUpdate PSS project  (15’+5’)Sebastien EvrardSlidesEDMSLS3C #202025-06-25
ServicesNew scaffolding contract (10’+5′)Frederic ChapronSlidesEDMSLS3C #202025-06-25
ServicesEN-ACE-COS workshop support during LS3 (10’+5′)Jordi BossySlidesEDMSLS3C #202025-06-25
New PLAN activitiesJean-Louis GrenardSlidesEDMSLS3C #202025-06-25
Coordination and ScheduleNew PLAN activitiesJeremie Bauche, Raymond VenessSlides #1EDMSLS3C #192025-06-11
Slides #2
HL-LHCHL-LHC Cores – Schedule Update (15’+5′)David Rodriguez GomezSlidesEDMSLS3C #192025-06-11
AWAKEStart of LS3 for AWAKE and CTD (10’+5′)Ans PardonsEDMSEDMSLS3C #192025-06-11
NA-CONSUpdate NA-CONS project (20’+5′)Yacine KadiSlidesEDMSLS3C #192025-06-11
Coordination and ScheduleLS3 LHC schedule update (25’+ 5′)Estrella Vergara FernandezEDMSEDMSLS3C #192025-06-11
Coordination and SchedulePLAN ContributionsMarta Vargas JorbaSlidesEDMSLS3C #182025-05-28
Coordination and ScheduleAnnouncement: New PLAN ActivitiesJean Ramos, Julien Parra-Lopez, Valerie Montabonnet, Xavier GenillonSlidesEDMSLS3C #182025-05-28
EL servicesLS3 power availability update and LHC schedule optimisation possibilities for EN-EL activities (25’+5′)Jan De VoghtSlidesEDMSLS3C #182025-05-28
LogisticsADR – transport of dangerous goods (10’+10′)Iqra Shahzadi, Jonathan GulleySlidesEDMSLS3C #182025-05-28
LogisticsUpdate space management status – Including LHC Point 1 and 5 (10’+5′)Cedric Halbert, Germana RiddoneSlides #1EDMSLS3C #182025-05-28
Slides #2
Slides #3
SafetyWelcomeJean-Philippe TockEDMSEDMSLS3C #172025-05-14
SafetyIntroductionAndreas HertySlidesEDMSLS3C #172025-05-14
SafetyRoles and responsibilities (15’+10′)Julien Mickael FernandezSlidesEDMSLS3C #172025-05-14
SafetyOperational Safety (25’+10′)Cyrille Patrick Bedel, John Robert EtheridgeSlidesEDMSLS3C #172025-05-14
SafetySafety Training (10’+5′)Julie BiringerSlides #1EDMSLS3C #172025-05-14
Slides #2
SafetyEnvironment and Waste Management in View of LS3 (10’+5′)Amel Ashila, Sabrina SchadeggEDMSLS3C #172025-05-14
SafetyRadiation Protection (10’+5′)Stefan RoeslerSlidesEDMSLS3C #172025-05-14
SafetyALARA Level 3 intervention list (draft) (5’+5′)Ans PardonsEDMSEDMSLS3C #172025-05-14
SafetySafety inspection and receptions during LS3 (10’+5′)David Tshilumba, Olivier TisonSlidesEDMSLS3C #172025-05-14
SafetyConclusions & DiscussionEDMSLS3C #172025-05-14
LogisticsAnnouncement: Update Storage space requests and “Bases de Chantier”Germana RiddoneSlidesEDMSLS3C #162025-04-30
Running FacilitiesFacilities running during LS3 (25’+5′)Bettina MikulecSlidesEDMSLS3C #162025-04-30
Coordination and SchedulePLAN status: Resource allocation (20’+5′)Marta Vargas JorbaSlidesEDMSLS3C #162025-04-30
SafetyLS3C safety meetingAndreas HertySlidesEDMSLS3C #152025-04-02
Coordination and ScheduleYETS 2025-26 roadmap for InjectorsMarzia BernardiniSlidesEDMSLS3C #152025-04-02
Engineering&IntegrationUpdate on ECR and Integration Studies for YETS 2025-26 and LS3 (30′ + 10′)Giulia Romagnoli, Julie Coupard, Tom BirtwistleSlides #1EDMSLS3C #152025-04-02
Slides #2
Slides #3
Coordination and ScheduleFeedbacks from the Chamonix Workshop on the LS3 session (25’+5′)Jean-Philippe TockSlidesEDMSLS3C #142025-02-19
Radioprotection Update on the Dismantling and Decontamination contract (NDDC) following shift of LS3 start date (15’+5′)Nicolas QuinquisSlidesEDMSLS3C #142025-02-19
LS3 CommitteeReminder of actions/recommendations (10′ + 5′)Charlotte Duchemin, Sebastien BlanchardSlidesEDMSLS3C #132024-11-27
HL-LHCPreliminary outcome for the HL-LHC Cost & Schedule Review 2024 (20′ + 5′)Markus ZerlauthSlidesEDMSLS3C #132024-11-27
Coordination and ScheduleCERN long term schedule update (10′ + 5′)Rende SteerenbergSlidesEDMSLS3C #132024-11-27
NA-CONSTDC2/TCC2 renovation: Feedback from the ATS-MB mini review (20′ + 5′)Yacine KadiSlidesEDMSLS3C #132024-11-27
Coordination and Schedule(E)YETS 2024-25 and YETS 2025-26 Master Schedules (10′ +10′)Marzia BernardiniSlidesLS3C #122024-10-30
Coordination and SchedulePLAN update YETS 2024-25 (15′ + 10′)Ayla BorglundSlidesLS3C #122024-10-30
Engineering&IntegrationUpdate on ECR and Integration Studies for YETS 2024-25 (30′ + 10′)Giulia Romagnoli, Julie Coupard, Thomas William BirtwistleSlides #1LS3C #122024-10-30
Slides #2
Slides #3
Coordination and ScheduleYETS 2025-26 (15′ + 10′)Jean-Philippe TockEDMSLS3C #112024-10-16
EN Dep GroupsEN-AA (5′ + 5′)Pierre NininSlidesLS3C #112024-10-16
LHC Large ExperimentsCMS (5′ + 5′)Paola TropeaSlidesLS3C #112024-10-16
SY Dep GroupsSY-BI (5′ + 5′)Raymond VenessSlidesLS3C #112024-10-16
SY Dep GroupsSY-RF (5′ +5′)Frank GerigkSlidesLS3C #112024-10-16
LS3 CommitteeFeedback from the LS3 Readiness Review (20′ + 5′)Jean-Philippe TockEDMSLS3C #112024-10-16
HL-LHCFeedback from the IT String day (20′ + 5′)Marta BajkoSlidesLS3C #112024-10-16
EL servicesEL-CONS project (20′ + 5′)Mario ParodiSlidesLS3C #102024-08-21
EL servicesDecabling project (20′ + 5′)Christian BernardSlidesLS3C #102024-08-21
Running FacilitiesStatus of the change requests for the facilities (primary beam lines) for YETS 2024-2025 and LS3 (20′ + 5′)Thomas William BirtwistleSlidesLS3C #102024-08-21
Engineering&IntegrationStatus of the ECRs and the integration studies for the experimental areas for LS3 (20′ + 5′)Giulia Romagnoli, Michael LazzaroniSlidesLS3C #102024-08-21
LS3 CommitteeLS3 Readiness Review AgendaCharlotte Duchemin, Jean-Philippe Tock, Rende Steerenberg, Sandra Benoit-Godet, Sebastien BlanchardEDMSLS3C #102024-08-21
EL servicesEN-EL contributions during LS3 – an update (15′ + 5′)Simao Pedro Costa MachadoSlidesLS3C #92024-08-07
Engineering&IntegrationIntegration Studies of the accelerators for LS3 activities (20′ + 5′)Jean-Pierre CorsoSlidesLS3C #92024-08-07
Engineering&IntegrationStatus of ECRs for the experimental areas – YETS 2024-25 (10′ + 5′)Giulia RomagnoliSlidesLS3C #92024-08-07
SurveySurvey Guidelines (20′ + 5′)Jean-Frederic FuchsSlidesLS3C #92024-08-07
LS3 CommitteeList of open actions/recommendationsCharlotte DucheminSlidesLS3C #82024-07-24
AWAKEAWAKE RUN2C&D PREP. (20′ + 5′)Edda GschwendtnerSlidesLS3C #82024-07-24
Coordination and ScheduleTE resources allocation for LS3 (10′ + 5′)Beniamino Di GirolamoSlidesLS3C #82024-07-24
NA-CONSPlans for the NA62 dismantling (10′ + 5′)Francois DuvalSlidesLS3C #82024-07-24
LHC Exp (tunnel)Mandate of the coordinator for the (smaller) physics experiments in the LHC machine (10’+5′)Oliver BoettcherSlidesLS3C #82024-07-24
Radioprotection Personal and operational dosimeter needs during LS3 (10′ + 5′)¶Heinz VinckeSlidesLS3C #82024-07-24
Coordination and SchedulePLAN status (10′ + 5′)Fernando Baltasar Dos Santos PedrosaSlidesLS3C #82024-07-24
Controls and SoftwareProposal for coordination of accelerator controls upgrades in LS3 (15’+5′)Marine Gourber-PaceSlidesLS3C #72024-07-03
Radioprotection ALARA Level 3 committee related to LS3 activities – status of received requestsAns PardonsEDMSLS3C #72024-07-03
Coordination and ScheduleImpact of possible LS3 delays on procurement contracts (5′ + 5′)Charles Carayon, Josh DavisonSlidesLS3C #72024-07-03
LogisticsLS3 storage management: reminder and current statusGermana RiddoneSlidesLS3C #72024-07-03
Civil EngineeringAnnouncement of SCE projects during LS3 (5’+5′)Denis PazemSlidesLS3C #72024-07-03
ISOLDE imprISOLDE Beam Dump Replacement & Sustainability (IBDRS) Project Readiness & Impact during LS3 (20′ + 5′)Ana-Paula Bernardes, Joachim VollaireEDMS #1LS3C #72024-07-03
EDMS #2
NA-CONSNA-CONS Review Summary and Results (15′ + 5′)Yacine KadiSlidesLS3C #72024-07-03
LS3 CommitteeLMC : LHC status, and follow up of operational issuesEDMSLS3C #62024-06-26
Coordination and ScheduleLS3 Readiness Review Agenda & OutlooksJean-Philippe TockEDMSLS3C #62024-06-26
LHC Large ExperimentsCMS plans for LS3 and its preparation (20′ + 5′)Paola TropeaSlidesLS3C #62024-06-26
LHC Large ExperimentsATLAS Activities During LS3 (20′ + 5′)Martin AleksaSlidesLS3C #62024-06-26
SafetyEvacuation exercises –  Planned Evacuations (15′ + 5′)Sara HansenSlidesLS3C #52024-06-12
Running FacilitiesSM18 Operation during LS3 (20′ + 5′)Luigi ScibileSlidesLS3C #52024-06-12
SRFSA18 – New SRF Facility on LHC Point 1.8 (20′ + 5′)David SmekensSlidesLS3C #52024-06-12
SafetyESP status and plan for (E)YETS 2024-25 (20’ + 5’)Anne-Laure PerrotSlidesLS3C #42024-05-29
LogisticsTransport and Handling in LS3 : highlights – EN-HE (15′ + 5′)Caterina BertoneSlidesLS3C #42024-05-29
PSS-CONSPSS-CONS Personnel Safety System Consolidation: Overview of LS3 activities (15’+5′)Anna SuwalskaSlidesLS3C #42024-05-29
TG-CONSTG-CONS Technical Gallery Consolidation Program: Overview of LS3 activities (10′ + 5′)Sebastien EvrardSlidesLS3C #42024-05-29
Coordination and ScheduleLong term schedule update (15′ + 5′)Jean-Philippe TockSlidesLS3C #32024-05-15
Engineering&IntegrationConfiguration and Layout  (20′ + 5′)Sonia Bartolome JimenezSlidesLS3C #32024-05-15
Radioprotection Intervention planning at CERN – ALARA rules (15’+5’)Claudia AhdidaSlidesLS3C #32024-05-15
Radioprotection Preparing LS3’s ALARA committees (15′ + 5′)Ans PardonsEDMSLS3C #32024-05-15
CNGS dismantlingThe CNGS Target Area Dismantling Project (20′ + 5′)Ans PardonsEDMSLS3C #32024-05-15
Engineering&IntegrationIntegration Studies of the accelerators for LS3 activities (20′ + 5′ questions)Julie CoupardSlidesLS3C #22024-04-17
Radioprotection / LogisticsLe transport interne de marchandises radioactives au CERN et le rôle du groupe de Radioprotection  (20′ + 5′)Philippe BertreixSlidesLS3C #22024-04-17
HL-LHCHL-LHC: overview of  LS3 activities (20′ + 5′ questions)Paolo FessiaSlidesLS3C #22024-04-17
BSTBeam-Screens Treatment project: overview of the activities during LS3 (20′ + 5′ questions)Guillaume RosazSlidesLS3C #22024-04-17
NA-CONSThe North Area Consolidation Project (20′ + 5′ questions)Thomas ZicklerSlidesLS3C #22024-04-17
HI-ECN3HI-ECN3 project: foreseen activities in LS3 (20′ + 5′ questions)Matthew FraserSlides #1LS3C #22024-04-17
Slides #2
AnnouncementsSlidesLS3C #22024-04-17
LS3 CommitteeIntroductionJean-Philippe TockEDMSLS3C #12024-03-20
LS3 CommitteeLS3C modalitiesCharlotte Duchemin, Sebastien BlanchardSlidesLS3C #12024-03-20
Coordination and ScheduleYETS 2024-2025 updateRende SteerenbergLS3C #12024-03-20
Coordination and SchedulePLANAyla BorglundLS3C #12024-03-20
Radioprotection / LogisticsRadioactive material and waste (storage, declaration)Stefan RoeslerSlidesLS3C #12024-03-20
LogisticsLS3 Space Management and LogisticsGermana RiddoneEDMSLS3C #12024-03-20
LS3 CommitteeLS3 Readiness ReviewJean-Philippe TockSlidesLS3C #12024-03-20