Topics and Presentations
The list includes only the contributions during regular LS3 Committee meetings. It does not include special (RR, Countdown, Mission,…) and satellite events.
| Domain | Title | Speakers | Slides | Minutes | Indico | Date |
| Project | Introduction to FASER and SND (5′ + 5′) | Francisco Sanchez Galan | Slides | EDMS | LS3C #42 | 2026-10-23 |
| Project | Announcement: AICE (5′ +5′) | Sergio Calatroni | Slides | EDMS | LS3C #42 | 2026-10-23 |
| Coordination and schedule | Dashboard Update (5′ + 5′) | Slides | EDMS | LS3C #42 | 2026-10-23 | |
| Coordination and schedule | PLAN general update (15′ + 5′) | Paula Lorente Gomez, Silvia Grau | Slides | EDMS | LS3C #42 | 2026-10-23 |
| Coordination and schedule | Update LHC Schedule (10′ + 5′) | Maria Barberan Marin | Slides | EDMS | LS3C #42 | 2026-10-23 |
| Radioprotection | Update on the Task Force on the storage of radioactive components (15′ + 5′) | Germana Riddone | Slides | EDMS | LS3C #42 | 2026-10-23 |
| Safety | Recent electrical incidents (LHC LSS1 & NA BA80) (10’+5′) | Julien Mickael Fernandez, Paolo Fessia | Slides | EDMS | LS3C #41 | 2026-10-09 |
| Coordination and schedule | Dashboard Update (5’+5′) | Beniamino Di Girolamo | Slides | EDMS | LS3C #41 | 2026-10-09 |
| Coordination and schedule | Injectors Status update & report on PS ISTs | Arne Vangraefschepe | Slides | EDMS | LS3C #41 | 2026-10-09 |
| Coordination and schedule | Update on the HI-ECN3 dismantling activities (15’+5′) | Fernando Baltasar Dos Santos Pedrosa | Slides | EDMS | LS3C #41 | 2026-10-09 |
| Coordination and schedule | REX & lesson learned from the dismantling activities CNGS & IBDRS (15’+5′) | Nicolas Quinquis | Slides | EDMS | LS3C #41 | 2026-10-09 |
| Coordination and schedule | Decision on TE resources for CM1 refurbishment (5′ + 5′) | Beniamino Di Girolamo | Slides | EDMS | LS3C #40 | 2026-09-25 |
| Coordination and schedule | Dashboard update (10′ + 5′) | Slides | EDMS | LS3C #40 | 2026-09-25 | |
| Coordination and schedule | ELQA at Warm: Results and potential impact on LS3 activities (15’+5′) | Giorgio D’Angelo | Slides | EDMS | LS3C #40 | 2026-09-25 |
| HL-LHC | HL-LHC report | Paolo Fessia | Slides | EDMS | LS3C #40 | 2026-09-25 |
| Engineering&Integration | Update on ECR integration studies | Giulia Romagnoli, Julie Coupard, Natalya Kahn, Tom Birtwistle | Slides #1 | EDMS | LS3C #40 | 2026-09-25 |
| Slides #2 | ||||||
| Slides #3 | ||||||
| Coordination and schedule | Report on ISTs for Linac4, PSB, SPS and injectors status | Markus Albert | Slides | EDMS | LS3C #40 | 2026-09-25 |
| Coordination and schedule | NA-CONS – BA80 and CT2 during LS3: Category 1 Worksite Perimeters and Schedule Impact (10′ + 5′) | Anastazja Sedzicka | Slides | EDMS | LS3C #39 | 2026-09-09 |
| Coordination and schedule | IMPACT prioritisation process (5’ + 5’) | Giovanni Chierico | Slides | EDMS | LS3C #39 | 2026-09-09 |
| Coordination and schedule | TCLD strategy : impact on LS3 schedule and resources (5’ + 5´) | Antonio Perillo Marcone | LS3C #39 | 2026-09-09 | ||
| Coordination and schedule | Availability and Status of Accelerators’ and Experiments’ Lifts (15′ + 5′) | Ingo Ruehl | Slides | EDMS | LS3C #39 | 2026-09-09 |
| Coordination and schedule | Dashboard update (10’+5′) | All, Beniamino Di Girolamo | Slides #1 | LS3C #39 | 2026-09-09 | |
| Slides #2 | ||||||
| Coordination and schedule | RP Dashboard (15’+5′) | Angelo Infantino | Slides | EDMS | LS3C #39 | 2026-09-09 |
| Safety | Updates to the Radiation Protection training programme (10′ + 5′) | Julie Biringer | Slides | EDMS | LS3C #39 | 2026-09-09 |
| Safety | Safety reminder: Fire detectors | Julien Mickael Fernandez | Slides | EDMS | LS3C #38 | 2026-08-26 |
| Coordination and schedule | Announcement: EACM Kick-off | Benoit Salvant | Slides | EDMS | LS3C #38 | 2026-08-26 |
| Coordination and schedule | CTF3 DBL Dismantling Activity (5’+5′) | Rosario Principe | Slides | EDMS | LS3C #38 | 2026-08-26 |
| Coordination and schedule | LHC Schedule status (15’+5′) | Giulia Papotti, Maria Barberan Marin, Michele Loffredo | Slides | EDMS | LS3C #38 | 2026-08-26 |
| Controls and Software | LS3 workflow management tool (15’+5′) | Lukasz Piotr Pater, Maryline Charrondiere, Matthias Bonora-Tam | Slides | EDMS | LS3C #38 | 2026-08-26 |
| Coordination and schedule | BST Readiness (10’+5′) | Guillaume Jonathan Rosaz | Slides | EDMS | LS3C #38 | 2026-08-26 |
| Coordination and schedule | AET Update (5’+5′) | Laura Hardy | Slides | EDMS | LS3C #38 | 2026-08-26 |
| HL-LHC | HL-LHC update (10’+5′) | Paolo Fessia | Slides | EDMS | LS3C #36 | 2026-07-29 |
| Coordination and Schedule | Electrical quality assurance @ Cold: Results and potential impact on LS3 activities (10’+5′) | Giorgio D’Angelo, Mateusz Jakub Bednarek | Slides | EDMS | LS3C #36 | 2026-07-29 |
| Safety | Lessons learnt from ESP deployment in the LHC (15′) | Anne-Laure Perrot | Slides | EDMS | LS3C #36 | 2026-07-29 |
| Safety | Processes & Safety forms for el. installations without C2E appointed yet (15’+5′) | Maria Papamichali | Slides #1 | EDMS | LS3C #36 | 2026-07-29 |
| Slides #2 | ||||||
| Slides #3 | ||||||
| Safety | Announcement: Prevention measures in relation to high fire risk across the CERN site | Simon Marsh | Slides | LS3C #35 | 2026-07-15 | |
| Safety | Announcement: Update on radiation dose alert and approval process (5’+5′) | Stefan Roesler | Slides | LS3C #35 | 2026-07-15 | |
| Coordination and Schedule | AET update (5’+5′) | Laura Hardy | Slides | LS3C #35 | 2026-07-15 | |
| Coordination and Schedule | LS3 Dashboards (15′ + 5′) | Beniamino Di Girolamo | Slides | LS3C #35 | 2026-07-15 | |
| Coordination and Schedule | LHC Cryogenics warm-up (15′ +5′) | Benjamin Bradu, Frederic Ferrand | Slides | LS3C #35 | 2026-07-15 | |
| Coordination and Schedule | LS3 LHC Status (10′ + 5′) | Maria Barberan Marin | Slides | LS3C #35 | 2026-07-15 | |
| Coordination and Schedule | LS3 Start at ATLAS (8′ + 2′) | Gerardo Velazquez Gutierrez, Martin Aleksa | Slides | LS3C #35 | 2026-07-15 | |
| Coordination and Schedule | LS3 Start at CMS (8′ + 2′) | David Hay, Paola Tropea | Slides | LS3C #35 | 2026-07-15 | |
| Coordination and Schedule | ISOLDE LS3 activities: progress report (15′ + 5′) | Joachim Vollaire | Slides | LS3C #35 | 2026-07-15 | |
| Running Facilities | Outcome from the running facility document (5 + 5′) | Richard Scrivens | Slides | LS3C #35 | 2026-07-15 | |
| Coordination and Schedule | MTP2026 outcome impact on LS3 (15’ + 10’) | Oliver Bruning | Slides | EDMS | LS3C #34 | 2026-07-01 |
| Coordination and Schedule | Outcome from the Mission: LS3 checkup event (15′ + 5′) | Jean-Philippe Tock | Slides | EDMS | LS3C #34 | 2026-07-01 |
| Coordination and Schedule | RF test and recent M2B1 event (10′ + 5′) | Katarzyna Turaj, Giulia Papotti | Slides #1 | EDMS | LS3C #34 | 2026-07-01 |
| Slides #2 | ||||||
| Coordination and Schedule | BE-CSS LS3 baseline deployment and impact (15′ + 5′) | Anastasiya Radeva Poncet | Slides | EDMS | LS3C #34 | 2026-07-01 |
| Obsolete Connectors – Status from standardisation committee for cables and connectors (12′ + 3′) | Simao Pedro Costa Machado | LS3C #34 | 2026-07-01 | |||
| Coordination and Schedule | PLAN activities – announcement (10′ + 10′) | Inigo Martin Melero, Sebastien Evrard | Slides #1 | EDMS | LS3C #34 | 2026-07-01 |
| Slides #2 | ||||||
| Coordination and Schedule | Update on AET Process (5′ + 5′) | Laura Hardy | Slides | EDMS | LS3C #34 | 2026-07-01 |
| Coordination and Schedule | LS3 Dashboards (20′ + 5′) | Beniamino Di Girolamo | Slides #1 | LS3C #34 | 2026-07-01 | |
| Slides #2 | ||||||
| Coordination and Schedule | The proposed Aladdin experiment at LHC IP3 and possible LS3 activities (15′ +5′) | Francesco Bertinelli | Slides | EDMS | LS3C #33 | 2026-06-03 |
| Controls and software | ITM Tool update – Result of the deployment and available training (15′ +5′) | Ricardo Almeida | Slides | EDMS | LS3C #33 | 2026-06-03 |
| Coordination and Schedule | Review of the LS3 committee resolutions (15′ +5′) | Charlotte Duchemin, Sebastien Blanchard | Slides | EDMS | LS3C #33 | 2026-06-03 |
| Coordination and Schedule | New AET Procedure – Autorisation Exceptionnelle de Travail – ( 15′ + 5′) | Charles Carayon, Didier Constant, Eloy Reguero Fuentes | EDMS | LS3C #32 | 2026-05-20 | |
| Project | ISOLDE Primary Areas Fire Safety and Ventilation Upgrade Project Reaches Completion | Melania Averna | Slides | EDMS | LS3C #32 | 2026-05-20 |
| Radioprotection | Update regarding the status of the ALARA3 committees (15′ + 10′) | Ans Pardons | Slides | EDMS | LS3C #32 | 2026-05-20 |
| Services | Status of AICE – Atom Interferometry CERN Experiment (15 ‘+ 5’) | Sergio Calatroni | Slides | EDMS | LS3C #32 | 2026-05-20 |
| Coordination and Schedule | Mission: LS3 Checkup – agenda | Richard Scrivens | Slides | EDMS | LS3C #31 | 2026-05-06 |
| Coordination and Schedule | Dashboards IBDRS & CTD | Beniamino Di Girolamo, Charlotte Duchemin, Tobias Bachmann | Slides | EDMS | LS3C #31 | 2026-05-06 |
| Radioprotection | North Area Radioactive Waste Task Force | Thomas Zickler | Slides | EDMS | LS3C #31 | 2026-05-06 |
| Engineering&Integration | Status of ECR, Integration studies for Accelerator (15′ +5′) | Julie Coupard, Sonia Bartolome Jimenez | Slides | EDMS | LS3C #31 | 2026-05-06 |
| Engineering&Integration | Status of ECR, Integration studies and WPA for EA (15′ +5′) | Natalya Kahn | Slides | EDMS | LS3C #31 | 2026-05-06 |
| Coordination and Schedule | Updated LS3 LHC Schedule (20′ + 10′) | Michele Loffredo | Slides | EDMS | LS3C #31 | 2026-05-06 |
| Safety | Safety announcement (5′) | Julien Mickael Fernandez | Slides | EDMS | LS3C #30 | 2026-04-22 |
| Coordination and Schedule | HIE-ISOLDE cryomodule activities during LS3 (15′ + 5′) | Walter Venturini Delsolaro | Slides | EDMS | LS3C #30 | 2026-04-22 |
| Coordination and Schedule | TE contribution to HIE-ISOLDE – WP6a – Resource & Schedule Outlook (10′ + 5′) | Amalia Ballarino | Slides | EDMS | LS3C #30 | 2026-04-22 |
| Safety | ESP implementation in the LHC and its injectors (20′ + 10′) | Anne-Laure Perrot, Denis Ribiollet | Slides | EDMS | LS3C #30 | 2026-04-22 |
| Coordination and Schedule | CNGS Hadron stopper shielding recovery: Feasibility study update (15′ + 10′) | Caterina Bertone, Jean-Louis Grenard | Slides | EDMS | LS3C #30 | 2026-04-22 |
| Coordination and Schedule | SCE Civil Engineering Activities (PLAN) – 5′ +5′ | Severin D’Armancourt | Slides | EDMS | LS3C #30 | 2026-04-22 |
| Coordination and Schedule | Dashboard SY-EPC, Linac4, PSB, PS&TT2, SPS (5′) | Beniamino Di Girolamo | Slides | EDMS | LS3C #30 | 2026-04-22 |
| Coordination and Schedule | Request for beam from ELENA (GBAR) – 10′ + 5′ | Pauline Comini | Slides | EDMS | LS3C #29 | 2026-03-25 |
| Coordination and Schedule | Robotics service: Capabilities, Planned Missions and Early Engagement (15′ + 10′) | Hannes Gamper | Slides | EDMS | LS3C #29 | 2026-03-25 |
| Controls and software | Status of the integration of the e-MIP tool in the EAM environment (15 + 10′) | Lukasz Piotr Pater, Matthias Bonora | Slides | EDMS | LS3C #29 | 2026-03-25 |
| Coordination and Schedule | SPS2 cabling activities (10′ + 5′) | Christian Bernard | Slides | EDMS | LS3C #29 | 2026-03-25 |
| Coordination and Schedule | Dashboard ISOLDE & CNGS & WP17 HL-LHC (5′) | Beniamino Di Girolamo | Slides | EDMS | LS3C #29 | 2026-03-25 |
| Coordination and Schedule | Master Schedule under Approval (5′) | David Nisbet | Slides | EDMS | LS3C #29 | 2026-03-25 |
| LS3 Committee | Feedback Chamonix (25′ + 10′) | Jean-Philippe Tock | Slides | EDMS | LS3C #28 | 2026-02-25 |
| Radioprotection / Logistics | ITM tool – update and demonstration of practical cases (15′ + 10′) | Philippe Bertreix | Slides | EDMS | LS3C #28 | 2026-02-25 |
| Radioprotection | Launch of the 2026 Radioactive waste forecast exercise (5′ + 5′) | Frederic Lionel Aberle | Slides | EDMS | LS3C #28 | 2026-02-25 |
| Safety | WSS role and responsibilities | Olivier Bernard Prouteau | Slides | EDMS | LS3C #27 | 2026-01-28 |
| Radioprotection | Update of ALARA Level 3 intervention list (10′ + 5′) | Ans Pardons | Slides | EDMS | LS3C #27 | 2026-01-28 |
| Radioprotection / Logistics | Status of the ITM tool for the internal transport of radioactive material (15′ +5′) | Ricardo Almeida | Slides | EDMS | LS3C #27 | 2026-01-28 |
| Radioprotection / Logistics | Optimization of the storage of radioactive components | Slides #1 | EDMS | LS3C #27 | 2026-01-28 | |
| Slides #2 | ||||||
| Logistics | Outcome of the LS3 space management and logistics review | Germana Riddone, Rende Steerenberg | Slides | EDMS | LS3C #26 | 2026-01-14 |
| Coordination and Schedule | PLAN | Fernando Baltasar Dos Santos Pedrosa | Slides | EDMS | LS3C #26 | 2026-01-14 |
| EL services | Mandate of the technical coordinator of the SPS2 activities | Bruno Balhan | Slides | EDMS | LS3C #26 | 2026-01-14 |
| Engineering&Integration | Integration Studies for the SPS BAs (5′) | Julie Coupard | EDMS | EDMS | LS3C #25 | 2025-11-26 |
| Safety | Electrical Safety Project – (20′ + 10′) | Anne-Laure Perrot | Slides | EDMS | LS3C #25 | 2025-11-26 |
| ISOLDE impr | The IBDRS project status (15′ + 5′) | Ana-Paula Bernardes | Slides | EDMS | LS3C #25 | 2025-11-26 |
| Engineering&Integration | ISOLDE ECRs update (5′ + 5′) | Joachim Vollaire | Slides | EDMS | LS3C #25 | 2025-11-26 |
| Engineering&Integration | Naming Conventions of Electrical Circuits and Power Converters for the SPS and Transfer Lines (10′ + 5′) | Jean-Baptiste Mayolini | Slides | EDMS | LS3C #25 | 2025-11-26 |
| Engineering&Integration | Update on Naming Changes in East and North Area | Giulia Romagnoli | Slides | EDMS | LS3C #25 | 2025-11-26 |
| LS3 Committee | Review of actions/recommendations (10′ + 5′) | Charlotte Duchemin, Sebastien Blanchard | Slides | EDMS | LS3C #25 | 2025-11-26 |
| Safety | Update on safety related documents (10′ + 5′) | Julien Mickael Fernandez | Slides | EDMS | LS3C #24 | 2025-10-29 |
| Safety | New self-rescue mask (10′ + 5′) | Anastasiia Khrapchun | Slides | EDMS | LS3C #24 | 2025-10-29 |
| Engineering&Integration | Status of ECR, Integration studies and WPA in view of YETS 2025-26 & LS3 (20′ + 10′) | Giulia Romagnoli, Julie Coupard, Sonia Bartolome Jimenez | Slides #1 | EDMS | LS3C #24 | 2025-10-29 |
| Slides #2 | ||||||
| HI-ECN3 | HIECN3 storage request (5′ + 5′) | Francois Butin | Slides | EDMS | LS3C #24 | 2025-10-29 |
| LS3 Committee | LS3 presentation to CERN’s Contractors (5′ + 5′) | Jean-Philippe Tock | Slides | EDMS | LS3C #24 | 2025-10-29 |
| Coordination and Schedule | Countdown to LS3: Injectors-related outcome (30’+10′) | Fernando Baltasar Dos Santos Pedrosa | Slides | EDMS | LS3C #23 | 2025-10-01 |
| Coordination and Schedule | LS3 injectors schedule optimisation (15’+5′) | Jean-Philippe Tock | EDMS | EDMS | LS3C #23 | 2025-10-01 |
| Safety | LHC underground occupancy review for LS3 (15’+5’) | Edda Iveland, Lorenzo Contini, Oriol Rios | EDMS | EDMS | LS3C #22 | 2025-08-20 |
| Civil Engineering | Civil engineering metallic structures to be installed during LS3 (10’+5’) | Severin D’Armancourt | Slides | EDMS | LS3C #22 | 2025-08-20 |
| Consolidation | AD/ELENA LS3 activities (15’+5′) | Francois Butin | Slides | EDMS | LS3C #22 | 2025-08-20 |
| NA-CONS | NA-CONS: PLAN & Logistics Updates (10′ + 5′) | Deepti Kandhol | Slides | EDMS | LS3C #22 | 2025-08-20 |
| Coordination and Schedule | PLAN activities – status (15’+5′) | Fernando Baltasar Dos Santos Pedrosa, Marta Vargas Jorba | Slides | EDMS | LS3C #22 | 2025-08-20 |
| LS3 Committee | Status of actions/recommendations (15′ + 5′) | Sebastien Blanchard | Slides | EDMS | LS3C #21 | 2025-07-09 |
| HI-ECN3 | HIECN3 project update (15’+5’) | Matthew Alexander Fraser | Slides | EDMS | LS3C #21 | 2025-07-09 |
| NA-CONS | NA62 dismantling update (10’+5’) | Hans Danielsson | Slides | EDMS | LS3C #21 | 2025-07-09 |
| Engineering&Integration | Update on Accelerators’ ECR for YETS 2025-26 and LS3 (10′ +5′) | Jean-Baptiste Mayolini | Slides | EDMS | LS3C #21 | 2025-07-09 |
| Engineering&Integration | Update on Accelerators’ Integration Studies for YETS 2025-26 and LS3 (10′ + 5′) | Julie Coupard | Slides | EDMS | LS3C #21 | 2025-07-09 |
| Engineering&Integration | Update on Experimental Areas’ ECR and Integration Studies for YETS 2025-26 and LS3 (10′ + 5′) | Natalya Kahn | Slides | EDMS | LS3C #21 | 2025-07-09 |
| ISOLDE impr | ISOLDE Improvement Program implementation during LS3 (20’+5’) | Ana-Paula Bernardes, Erwin Siesling | Slides #1 | EDMS | LS3C #20 | 2025-06-25 |
| Slides #2 | ||||||
| PSS | Update PSS project (15’+5’) | Sebastien Evrard | Slides | EDMS | LS3C #20 | 2025-06-25 |
| Services | New scaffolding contract (10’+5′) | Frederic Chapron | Slides | EDMS | LS3C #20 | 2025-06-25 |
| Services | EN-ACE-COS workshop support during LS3 (10’+5′) | Jordi Bossy | Slides | EDMS | LS3C #20 | 2025-06-25 |
| New PLAN activities | Jean-Louis Grenard | Slides | EDMS | LS3C #20 | 2025-06-25 | |
| Coordination and Schedule | New PLAN activities | Jeremie Bauche, Raymond Veness | Slides #1 | EDMS | LS3C #19 | 2025-06-11 |
| Slides #2 | ||||||
| HL-LHC | HL-LHC Cores – Schedule Update (15’+5′) | David Rodriguez Gomez | Slides | EDMS | LS3C #19 | 2025-06-11 |
| AWAKE | Start of LS3 for AWAKE and CTD (10’+5′) | Ans Pardons | EDMS | EDMS | LS3C #19 | 2025-06-11 |
| NA-CONS | Update NA-CONS project (20’+5′) | Yacine Kadi | Slides | EDMS | LS3C #19 | 2025-06-11 |
| Coordination and Schedule | LS3 LHC schedule update (25’+ 5′) | Estrella Vergara Fernandez | EDMS | EDMS | LS3C #19 | 2025-06-11 |
| Coordination and Schedule | PLAN Contributions | Marta Vargas Jorba | Slides | EDMS | LS3C #18 | 2025-05-28 |
| Coordination and Schedule | Announcement: New PLAN Activities | Jean Ramos, Julien Parra-Lopez, Valerie Montabonnet, Xavier Genillon | Slides | EDMS | LS3C #18 | 2025-05-28 |
| EL services | LS3 power availability update and LHC schedule optimisation possibilities for EN-EL activities (25’+5′) | Jan De Voght | Slides | EDMS | LS3C #18 | 2025-05-28 |
| Logistics | ADR – transport of dangerous goods (10’+10′) | Iqra Shahzadi, Jonathan Gulley | Slides | EDMS | LS3C #18 | 2025-05-28 |
| Logistics | Update space management status – Including LHC Point 1 and 5 (10’+5′) | Cedric Halbert, Germana Riddone | Slides #1 | EDMS | LS3C #18 | 2025-05-28 |
| Slides #2 | ||||||
| Slides #3 | ||||||
| Safety | Welcome | Jean-Philippe Tock | EDMS | EDMS | LS3C #17 | 2025-05-14 |
| Safety | Introduction | Andreas Herty | Slides | EDMS | LS3C #17 | 2025-05-14 |
| Safety | Roles and responsibilities (15’+10′) | Julien Mickael Fernandez | Slides | EDMS | LS3C #17 | 2025-05-14 |
| Safety | Operational Safety (25’+10′) | Cyrille Patrick Bedel, John Robert Etheridge | Slides | EDMS | LS3C #17 | 2025-05-14 |
| Safety | Safety Training (10’+5′) | Julie Biringer | Slides #1 | EDMS | LS3C #17 | 2025-05-14 |
| Slides #2 | ||||||
| Safety | Environment and Waste Management in View of LS3 (10’+5′) | Amel Ashila, Sabrina Schadegg | EDMS | LS3C #17 | 2025-05-14 | |
| Safety | Radiation Protection (10’+5′) | Stefan Roesler | Slides | EDMS | LS3C #17 | 2025-05-14 |
| Safety | ALARA Level 3 intervention list (draft) (5’+5′) | Ans Pardons | EDMS | EDMS | LS3C #17 | 2025-05-14 |
| Safety | Safety inspection and receptions during LS3 (10’+5′) | David Tshilumba, Olivier Tison | Slides | EDMS | LS3C #17 | 2025-05-14 |
| Safety | Conclusions & Discussion | EDMS | LS3C #17 | 2025-05-14 | ||
| Logistics | Announcement: Update Storage space requests and “Bases de Chantier” | Germana Riddone | Slides | EDMS | LS3C #16 | 2025-04-30 |
| Running Facilities | Facilities running during LS3 (25’+5′) | Bettina Mikulec | Slides | EDMS | LS3C #16 | 2025-04-30 |
| Coordination and Schedule | PLAN status: Resource allocation (20’+5′) | Marta Vargas Jorba | Slides | EDMS | LS3C #16 | 2025-04-30 |
| Safety | LS3C safety meeting | Andreas Herty | Slides | EDMS | LS3C #15 | 2025-04-02 |
| Coordination and Schedule | YETS 2025-26 roadmap for Injectors | Marzia Bernardini | Slides | EDMS | LS3C #15 | 2025-04-02 |
| Engineering&Integration | Update on ECR and Integration Studies for YETS 2025-26 and LS3 (30′ + 10′) | Giulia Romagnoli, Julie Coupard, Tom Birtwistle | Slides #1 | EDMS | LS3C #15 | 2025-04-02 |
| Slides #2 | ||||||
| Slides #3 | ||||||
| Coordination and Schedule | Feedbacks from the Chamonix Workshop on the LS3 session (25’+5′) | Jean-Philippe Tock | Slides | EDMS | LS3C #14 | 2025-02-19 |
| Radioprotection | Update on the Dismantling and Decontamination contract (NDDC) following shift of LS3 start date (15’+5′) | Nicolas Quinquis | Slides | EDMS | LS3C #14 | 2025-02-19 |
| LS3 Committee | Reminder of actions/recommendations (10′ + 5′) | Charlotte Duchemin, Sebastien Blanchard | Slides | EDMS | LS3C #13 | 2024-11-27 |
| HL-LHC | Preliminary outcome for the HL-LHC Cost & Schedule Review 2024 (20′ + 5′) | Markus Zerlauth | Slides | EDMS | LS3C #13 | 2024-11-27 |
| Coordination and Schedule | CERN long term schedule update (10′ + 5′) | Rende Steerenberg | Slides | EDMS | LS3C #13 | 2024-11-27 |
| NA-CONS | TDC2/TCC2 renovation: Feedback from the ATS-MB mini review (20′ + 5′) | Yacine Kadi | Slides | EDMS | LS3C #13 | 2024-11-27 |
| Coordination and Schedule | (E)YETS 2024-25 and YETS 2025-26 Master Schedules (10′ +10′) | Marzia Bernardini | Slides | LS3C #12 | 2024-10-30 | |
| Coordination and Schedule | PLAN update YETS 2024-25 (15′ + 10′) | Ayla Borglund | Slides | LS3C #12 | 2024-10-30 | |
| Engineering&Integration | Update on ECR and Integration Studies for YETS 2024-25 (30′ + 10′) | Giulia Romagnoli, Julie Coupard, Thomas William Birtwistle | Slides #1 | LS3C #12 | 2024-10-30 | |
| Slides #2 | ||||||
| Slides #3 | ||||||
| Coordination and Schedule | YETS 2025-26 (15′ + 10′) | Jean-Philippe Tock | EDMS | LS3C #11 | 2024-10-16 | |
| EN Dep Groups | EN-AA (5′ + 5′) | Pierre Ninin | Slides | LS3C #11 | 2024-10-16 | |
| LHC Large Experiments | CMS (5′ + 5′) | Paola Tropea | Slides | LS3C #11 | 2024-10-16 | |
| SY Dep Groups | SY-BI (5′ + 5′) | Raymond Veness | Slides | LS3C #11 | 2024-10-16 | |
| SY Dep Groups | SY-RF (5′ +5′) | Frank Gerigk | Slides | LS3C #11 | 2024-10-16 | |
| LS3 Committee | Feedback from the LS3 Readiness Review (20′ + 5′) | Jean-Philippe Tock | EDMS | LS3C #11 | 2024-10-16 | |
| HL-LHC | Feedback from the IT String day (20′ + 5′) | Marta Bajko | Slides | LS3C #11 | 2024-10-16 | |
| EL services | EL-CONS project (20′ + 5′) | Mario Parodi | Slides | LS3C #10 | 2024-08-21 | |
| EL services | Decabling project (20′ + 5′) | Christian Bernard | Slides | LS3C #10 | 2024-08-21 | |
| Running Facilities | Status of the change requests for the facilities (primary beam lines) for YETS 2024-2025 and LS3 (20′ + 5′) | Thomas William Birtwistle | Slides | LS3C #10 | 2024-08-21 | |
| Engineering&Integration | Status of the ECRs and the integration studies for the experimental areas for LS3 (20′ + 5′) | Giulia Romagnoli, Michael Lazzaroni | Slides | LS3C #10 | 2024-08-21 | |
| LS3 Committee | LS3 Readiness Review Agenda | Charlotte Duchemin, Jean-Philippe Tock, Rende Steerenberg, Sandra Benoit-Godet, Sebastien Blanchard | EDMS | LS3C #10 | 2024-08-21 | |
| EL services | EN-EL contributions during LS3 – an update (15′ + 5′) | Simao Pedro Costa Machado | Slides | LS3C #9 | 2024-08-07 | |
| Engineering&Integration | Integration Studies of the accelerators for LS3 activities (20′ + 5′) | Jean-Pierre Corso | Slides | LS3C #9 | 2024-08-07 | |
| Engineering&Integration | Status of ECRs for the experimental areas – YETS 2024-25 (10′ + 5′) | Giulia Romagnoli | Slides | LS3C #9 | 2024-08-07 | |
| Survey | Survey Guidelines (20′ + 5′) | Jean-Frederic Fuchs | Slides | LS3C #9 | 2024-08-07 | |
| LS3 Committee | List of open actions/recommendations | Charlotte Duchemin | Slides | LS3C #8 | 2024-07-24 | |
| AWAKE | AWAKE RUN2C&D PREP. (20′ + 5′) | Edda Gschwendtner | Slides | LS3C #8 | 2024-07-24 | |
| Coordination and Schedule | TE resources allocation for LS3 (10′ + 5′) | Beniamino Di Girolamo | Slides | LS3C #8 | 2024-07-24 | |
| NA-CONS | Plans for the NA62 dismantling (10′ + 5′) | Francois Duval | Slides | LS3C #8 | 2024-07-24 | |
| LHC Exp (tunnel) | Mandate of the coordinator for the (smaller) physics experiments in the LHC machine (10’+5′) | Oliver Boettcher | Slides | LS3C #8 | 2024-07-24 | |
| Radioprotection | Personal and operational dosimeter needs during LS3 (10′ + 5′)¶ | Heinz Vincke | Slides | LS3C #8 | 2024-07-24 | |
| Coordination and Schedule | PLAN status (10′ + 5′) | Fernando Baltasar Dos Santos Pedrosa | Slides | LS3C #8 | 2024-07-24 | |
| Controls and Software | Proposal for coordination of accelerator controls upgrades in LS3 (15’+5′) | Marine Gourber-Pace | Slides | LS3C #7 | 2024-07-03 | |
| Radioprotection | ALARA Level 3 committee related to LS3 activities – status of received requests | Ans Pardons | EDMS | LS3C #7 | 2024-07-03 | |
| Coordination and Schedule | Impact of possible LS3 delays on procurement contracts (5′ + 5′) | Charles Carayon, Josh Davison | Slides | LS3C #7 | 2024-07-03 | |
| Logistics | LS3 storage management: reminder and current status | Germana Riddone | Slides | LS3C #7 | 2024-07-03 | |
| Civil Engineering | Announcement of SCE projects during LS3 (5’+5′) | Denis Pazem | Slides | LS3C #7 | 2024-07-03 | |
| ISOLDE impr | ISOLDE Beam Dump Replacement & Sustainability (IBDRS) Project Readiness & Impact during LS3 (20′ + 5′) | Ana-Paula Bernardes, Joachim Vollaire | EDMS #1 | LS3C #7 | 2024-07-03 | |
| EDMS #2 | ||||||
| NA-CONS | NA-CONS Review Summary and Results (15′ + 5′) | Yacine Kadi | Slides | LS3C #7 | 2024-07-03 | |
| LS3 Committee | LMC : LHC status, and follow up of operational issues | EDMS | LS3C #6 | 2024-06-26 | ||
| Coordination and Schedule | LS3 Readiness Review Agenda & Outlooks | Jean-Philippe Tock | EDMS | LS3C #6 | 2024-06-26 | |
| LHC Large Experiments | CMS plans for LS3 and its preparation (20′ + 5′) | Paola Tropea | Slides | LS3C #6 | 2024-06-26 | |
| LHC Large Experiments | ATLAS Activities During LS3 (20′ + 5′) | Martin Aleksa | Slides | LS3C #6 | 2024-06-26 | |
| Safety | Evacuation exercises – Planned Evacuations (15′ + 5′) | Sara Hansen | Slides | LS3C #5 | 2024-06-12 | |
| Running Facilities | SM18 Operation during LS3 (20′ + 5′) | Luigi Scibile | Slides | LS3C #5 | 2024-06-12 | |
| SRF | SA18 – New SRF Facility on LHC Point 1.8 (20′ + 5′) | David Smekens | Slides | LS3C #5 | 2024-06-12 | |
| Safety | ESP status and plan for (E)YETS 2024-25 (20’ + 5’) | Anne-Laure Perrot | Slides | LS3C #4 | 2024-05-29 | |
| Logistics | Transport and Handling in LS3 : highlights – EN-HE (15′ + 5′) | Caterina Bertone | Slides | LS3C #4 | 2024-05-29 | |
| PSS-CONS | PSS-CONS Personnel Safety System Consolidation: Overview of LS3 activities (15’+5′) | Anna Suwalska | Slides | LS3C #4 | 2024-05-29 | |
| TG-CONS | TG-CONS Technical Gallery Consolidation Program: Overview of LS3 activities (10′ + 5′) | Sebastien Evrard | Slides | LS3C #4 | 2024-05-29 | |
| Coordination and Schedule | Long term schedule update (15′ + 5′) | Jean-Philippe Tock | Slides | LS3C #3 | 2024-05-15 | |
| Engineering&Integration | Configuration and Layout (20′ + 5′) | Sonia Bartolome Jimenez | Slides | LS3C #3 | 2024-05-15 | |
| Radioprotection | Intervention planning at CERN – ALARA rules (15’+5’) | Claudia Ahdida | Slides | LS3C #3 | 2024-05-15 | |
| Radioprotection | Preparing LS3’s ALARA committees (15′ + 5′) | Ans Pardons | EDMS | LS3C #3 | 2024-05-15 | |
| CNGS dismantling | The CNGS Target Area Dismantling Project (20′ + 5′) | Ans Pardons | EDMS | LS3C #3 | 2024-05-15 | |
| Engineering&Integration | Integration Studies of the accelerators for LS3 activities (20′ + 5′ questions) | Julie Coupard | Slides | LS3C #2 | 2024-04-17 | |
| Radioprotection / Logistics | Le transport interne de marchandises radioactives au CERN et le rôle du groupe de Radioprotection (20′ + 5′) | Philippe Bertreix | Slides | LS3C #2 | 2024-04-17 | |
| HL-LHC | HL-LHC: overview of LS3 activities (20′ + 5′ questions) | Paolo Fessia | Slides | LS3C #2 | 2024-04-17 | |
| BST | Beam-Screens Treatment project: overview of the activities during LS3 (20′ + 5′ questions) | Guillaume Rosaz | Slides | LS3C #2 | 2024-04-17 | |
| NA-CONS | The North Area Consolidation Project (20′ + 5′ questions) | Thomas Zickler | Slides | LS3C #2 | 2024-04-17 | |
| HI-ECN3 | HI-ECN3 project: foreseen activities in LS3 (20′ + 5′ questions) | Matthew Fraser | Slides #1 | LS3C #2 | 2024-04-17 | |
| Slides #2 | ||||||
| Announcements | Slides | LS3C #2 | 2024-04-17 | |||
| LS3 Committee | Introduction | Jean-Philippe Tock | EDMS | LS3C #1 | 2024-03-20 | |
| LS3 Committee | LS3C modalities | Charlotte Duchemin, Sebastien Blanchard | Slides | LS3C #1 | 2024-03-20 | |
| Coordination and Schedule | YETS 2024-2025 update | Rende Steerenberg | LS3C #1 | 2024-03-20 | ||
| Coordination and Schedule | PLAN | Ayla Borglund | LS3C #1 | 2024-03-20 | ||
| Radioprotection / Logistics | Radioactive material and waste (storage, declaration) | Stefan Roesler | Slides | LS3C #1 | 2024-03-20 | |
| Logistics | LS3 Space Management and Logistics | Germana Riddone | EDMS | LS3C #1 | 2024-03-20 | |
| LS3 Committee | LS3 Readiness Review | Jean-Philippe Tock | Slides | LS3C #1 | 2024-03-20 |